Area 7500
Four months from contract signing to the first pounds of production...
Optima Chemical came through once again with design, construction, and start
up of a major Capital project completed within a very condensed and demanding
timeframe. A Solidaire® dryer system including Slurry feed and adjustment tanks,
natural gas burner, Mikropul bag house with solids discharging system, blower
and control system, solids conveying and a supersack loading station were
installed. The project also included erection of a new building and structure to
house these unit operations. The entire project was completed and production
start up commenced within 4 months of first breaking ground to pour concrete.
In addition to our Chemistry and Process Engineering expertise, our dedicated
staff can provide the construction and process modification support needed to
meet the most challenging schedules.
|